| ID | Vote Date
| Amount
| Type | Yes | No | Result | Performance Clause |
3457
| 07/12/2016
| 2014-2015 $198,206 2015-2016 $272,532 2016-2017 $272,532 2017-2018 $272,532 2018-2019 $272,532 2019-2020 $272,532 2020-2021 $850,219 2021-2022 $1,460,756 2022-2023 $1,456,256 2023-2024 $1,460,465 2024-2025 $1,038,975 2025-2026 $1,040,175 2026-2027 $1,040,475 2027-2028 $1,037,200 2028-2029 $1,041,787 2029-2030 $1,037,850 Total: $13,025,024
| RS - 2014
| 5
| 0
| Passed
| Has Performance Clause
|
Brief Description: Paying the costs of school building renovations and replacement of lights to LED in classrooms, hallways, and exterior; replacement of flooring and ceiling tiled areas; HVAC upgrades throughout the building including new piping, chiller, unit ventilators, boiler replacements; VAV systems, controls upgrades for building comfort; technology upgrades; and equipment aquisition related to said projects.
Actual Wording: Be it resolved that the Lake Geneva J1 School District is exercising its taxing authority under s. 121.91 (4) (0), Wis. Stats., to exceed the revenue limit on a non-recurring basis by an amount the district will spend on new energy efficiency measures and renewable energy efficiency products for the 2016-2017 school year and fifteen (15) years of debt for the term of the notes and bonds. After review of the recommendations report per 66.0133(2)(b) the district has determined that the $10,000,000.00 it would spend on energy efficiency projects recommended in the report is not likely to exceed the amount to be saved in utility costs and non-utility costs over the remaining fifty (50) year useful life of the facility to which the measures apply. the board has entered into a fifteen year performance contract under s. 66.0133, Stats., with McKinstry for a project to implement the following energy efficiency measures or purchase energy efficiency products and identified the following cost recovery performance indicators per table 4.2 to measure energy savings and/or operational savings for each including the timeline for cost recovery. The board shall annually perform an evaluation of the performance indicators and shall report to the electorate as an addendum in the required published summary document per s. 65.90, Wis. Stats., and in the school districts newsletter or in the published minutes of the school board meeting. the board shall use this evaluation to determine the amount of energy (utility) cost savings, as a result of the project.
|
| |
| |
| |